PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfill and waterproofing along foundation walls at c.l 6 (G-M) at Elev.7-Stair -4,5 Facing West (800x600).jpg Building platforms for the Elevators Facing South-East (800x600).jpg Damaged anchor bolts at Column C-2 (800x600).jpg Stripped foundation walls at Elev. 7-Stair -4,5 Facing East (800x600).jpg Stripping the bearing plate boxes at Elev. 4-Stair -2 Facing South (800x600).jpg Stripping the bearing plate boxes at Elev. 5,6 2nd floor Facing South-West  (800x600).jpg
Previous pageNext page Stripping the bearing plate boxes at Elev. 4-Stair -2 Facing South (800x600)
Stripping the bearing plate boxes at Elev. 4-Stair -2 Facing South (800x600)